• Donate
  • Login
Saturday, July 11, 2026
  • Login
  • Register
Canary
Cart / £0.00

No products in the basket.

MEDIA THAT DISRUPTS
  • UK
  • Global
  • Opinion
  • Skwawkbox
  • Manage Subscription
  • Support
  • Features
    • Health
    • Environment
    • Science
    • Feature
    • Sport & Gaming
    • Lifestyle
    • Tech
    • Business
    • Money
    • Travel
    • Property
    • Food
    • Media
  • SHOP
No Result
View All Result
MANAGE SUBSCRIPTION
SUPPORT
  • UK
  • Global
  • Opinion
  • Skwawkbox
  • Manage Subscription
  • Support
  • Features
    • Health
    • Environment
    • Science
    • Feature
    • Sport & Gaming
    • Lifestyle
    • Tech
    • Business
    • Money
    • Travel
    • Property
    • Food
    • Media
  • SHOP
No Result
View All Result
Canary
No Result
View All Result
  • Editorial
  • Explainer
  • Global
  • Opinion
  • Environment
  • Feature
  • Food
  • Health
  • Science
  • Skwawkbox
  • UK

Grenfell refurbishment firms expressed no trace of responsibility, inquiry told

The Canary by The Canary
27 January 2020
in News, UK
Reading Time: 3 mins read
169 4
A A
0
Home UK News
Share on FacebookShare on TwitterShare on BlueskyShare via WhatsAppShare via TelegramShare on Threads

Firms involved in the refurbishment of Grenfell Tower have expressed “no trace of responsibility” for the catastrophic fire, despite experts saying the work failed to comply with building regulations, an inquiry has heard.

The second phase of the investigation into the disaster opened on Monday and will consider how the high-rise block came to be wrapped in flammable cladding, which phase one found was the “principal” reason for the rapid spread of flames.

Counsel to the inquiry Richard Millett QC said in his opening remarks: “With the sole exception of RBKC (Royal Borough of Kensington and Chelsea), not a single core participant involved in the primary refurbishment of Grenfell Tower has felt able to make an unqualified submission against its own interests.

“With that solitary exception, Mr Chairman, one finds in those detailed and carefully crafted statements no trace of any acceptance of any responsibility for what happened at Grenfell Tower.

“Not from the architects, not from the contract managers, main contractors.

“Any member of the public reading those statements and taking them all at face value would be forced to conclude that everyone involved in the refurbishment of Grenfell Tower did what they were supposed to do and nobody made any serious or causative mistakes.

“All core participants who played a material part in Grenfell Tower have laid out a detailed case that it relied on others, and how in no way was the work it did either substandard or non-compliant (with building regulations).

“In every case, what happened was, as each of them would have it, someone else’s fault.”

Millett told chairman Martin Moore-Bick he should bear in mind a conclusion reached in the first part of the inquiry, that work “did not comply with certain key aspects of the building regulations”.

The lead architect for the refurbishment, Studio E, said it “did not have any knowledge that the products used on the tower were unsafe” and called itself a “conscientious, ethical, and responsible” firm.

In a statement to the inquiry, it said: “Product manufacturers produced materials and testing data which had the effect of misleading designers to consider that their products were safe.”

“Studio E considers that it acted as would be expected as a reasonably competent architect in its position”, the firm added, saying it “hopes that this investigation establishes why so many professionals and building control departments across the country considered these materials to be suitable for use”.

The second stage of the investigation comes after a member of the inquiry panel resigned, after she was linked to a charitable arm of the firm which supplied the tower block’s deadly cladding.

Benita Mehra tendered her resignation to prime minister Boris Johnson on Saturday, after it was disclosed that she is an immediate past president of the Women’s Engineering Society which, according to the society’s website, last year received funding from Arconic – the supplier of Grenfell’s cladding – for an apprentice conference.

Michael Mansfield QC, representing victims, said there has been “a stunning silence” from the prime minister and the cabinet office on the resignation of Mehra from the panel on Saturday.

He added there had been “not a word about whether there is going to be a replacement”.

Mansfield told Moore-Bick it would “lend considerable force to this venture” if he could confirm whether she would be replaced and “what the difficulties are”.

Survivors’ groups have said phase two of the inquiry must focus on who is to blame for the “devastating refurbishment” of the 25-storey building between 2012 and 2016.

Share128Tweet80ShareSendShareShare
Previous Post

The major threat to polar bears that no-one’s even talking about

Next Post

DWP staff are allegedly ‘trolling’ independent journalists

Next Post
The DWP logo with busted across it

DWP staff are allegedly 'trolling' independent journalists

London Loo Codes Logo

A genius campaign is disrupting corporate London, one loo at a time

Police surveillance

Everyone needs to hear this important message about the domestic extremism scandal

Child survivors of Auschwitz

On Holocaust Remembrance Day, some MPs should hang their heads in shame

Crowd gathers in defence of Julian Assange outside Belmarsh prison

French Yellow Vests hold large solidarity demo for Julian Assange at Belmarsh prison

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Israel
Skwawkbox

Israel lobby smears Mamdani’s wife Rama for celebrating Mary as Palestinian

by Skwawkbox
10 July 2026
Ann Widdecombe
News

Ann Widdecombe: ghouls gloss over bigotry to praise “fun, feisty” politician as suspect arrested

by Joe Glenton
10 July 2026
Timms Review
Analysis

Disability charities and campaigning organisations react to the interim Timms Review

by Grace
10 July 2026
Palantir
Analysis

Cross-party MPs urge Labour to drop £330m Palantir NHS contract

by Cameron Baillie
10 July 2026
British Army
Analysis

Kill chain: British Army tests new Anduril battlefield spy drones

by Joe Glenton
10 July 2026

The Canary
PO Box 71199
LONDON
SE20 9EX

Canary Media Ltd – registered in England. Company registration number 09788095.

For guest posting, contact [email protected]

For other enquiries, contact: [email protected]

Complaints and Corrections

About the Canary

Meet the Team

© Canary Media Ltd 2026, all rights reserved | Website by Monster | Hosted by Krystal | Privacy Settings

Ok

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • UK
  • Global
  • Opinion
  • Skwawkbox
  • Manage Subscription
  • Support
  • Features
    • Health
    • Environment
    • Science
    • Feature
    • Sport & Gaming
    • Lifestyle
    • Tech
    • Business
    • Money
    • Travel
    • Property
    • Food
    • Media
  • SHOP
  • Login
  • Sign Up
  • Cart